Driftwood Pedestrian Bridge
Nahanni Construction was trusted with installing a pedestrian bridge in the highly sensitive environmental area of driftwood canyon. The completed bridge is shown on the left.
Driftwood Bridge at Factory
Because the location of this site was a highly sensitive environmental area, the bridge was fabricated off site and trucked in.
Assembling the bridge
Once on site the bridge was assembled away from sensitive areas to minimize environmental disterbance.
Putting the Bridge In Place
A Rain Coast Crane was used to move the assembled bridge in to place while minimizing disturbance to the creek.
Related Projects
Start Your Project With Nahanni CONTACT US