Skip to main content
Toggle navigation
Home
Services
Past Projects
Contact
Past Projects
All
Service
Past Projects
Bridge
Forestry
Demolition
Road Building and Maintenance
Bridge Installation and Repair
Heavy Equipment Operator Training
Sand and Snow Plow
When Doug's home suffered burn damage from a house fire, the insurance company trusted Nahanni Construction to take care of the demolition of the house safely and efficiently. Trust your next demolition project with Nahanni.
House Demolition
A project for the Ministry of Forests. Hulcross Bridge was a forestry road bridge that was hit by flooding in 2011. The approaches were completely washed out. If you have a washed out bridge trust Nahanni construction with a rebuild that will last.
Hulcross Bridge
BC Hydro trusted Nahanni Construction with the build of Firth bridge on a fish bearing stream. Nahanni Construction ensured environmental procedures were followed to minimize environmental impact. If you project has a risk of affecting the environment Nahanni can help. Talk to us today.
Firth Bridge - A BC Hydro Project
Nahanni Construction was hired by the Ministry of Transportation and Infrastructure to sort and load rip rap from blasting, hauling material for road fill and building banks. Find out how Nahanni can get your the materials you need in an efficient manner.
2011 Flood Road Repair in the Pine Pass
Entrusted by BC Parks to construct a pedestrian bridge over Driftwood Canyon while minimizing environmental impact in this highly sensitive environmental area. Trust Nahanni with your next construction project in a highly sensitive environmental area. Find out how we can help.
Driftwood Canyon Bridge
In 2010 Nahanni construction was chosen by the Ministry of Forests to supply and install cross tie timbers and decking for Wantsa Bridge in Prince George. Find out how we can help you with your next bridge project.
Wantsa Bridge Re-deck
← Previous
1
(current)
2
Next →